The power generating sets are completely integrated, fully operational packages equipped with all accessories and auxiliary systems. The scope of the power generating set supply is subject to changes depending on the configuration and based on the results of continuous improvement of the equipment technical definition. Besides the standard scope of equipment, a wide range of optional equipment is available to meet the customer installation and operation requirements.
The units have either outdoor or indoor design and can be operated as stand-alone units or as a part of power generating plant (following the customer request various turbine generators of identical performance, water-heating boilers or waste heat recovery units and booster compression stations can be used) providing grid-parallel operation.
Rated power, MW
|
6.3
|
|
Voltage at generator terminals, kV
|
6.3/ 10.5
|
|
Efficiency, %
|
32.0
|
|
Fuel utilization factor (cogeneration), %
|
75.6
|
|
Overhaul life expectancy, h
|
25 000
|
|
Assigned life expectancy, h
|
100 000
|
|
Service life, years
|
20
|
|
Delivery period, months
|
9-12
|
|
Installation period, months
|
2-3
|
|
Gas fuel flow at nominal rating, kg/h
|
1 418
|
|
Heat rate, Gcal/hour
|
7.5
|
|
Plant overall dimensions, m
|
14.6 х 3.6 х 3.8
|
Gas turbine and gas reciprocating power plants

Download the list of gas turbine and gas reciprocating power plants (doc, 76 KB)
UEC - Gas Turbines is an integrated supplier and ЕРС-contractor (EPC - engineering, procurement and construction) for production of gas turbine and gas reciprocating power plants and gas compressor facilities. The company provides comprehensive project implementation including equipment development and manufacturing, design and civil works, installation and installation supervision, start-up and commissioning at the customer site as well as both warranty and post-warranty service of the sets and their systems. If necessary, we are ready to implement turnkey project at your earliest convenience.
Comprehensive project implementation by UEC – Gas Turbines allows a considerable reduction of the customer’s costs and facility commissioning period. All works on customer site are performed by highly skilled specialists having considerable experience in installation and maintenance including those in severe weather conditions. All works performed are supported by appropriate licenses and certificates.