GTD-10RM gas turbine engine (PAO UEC - Saturn, Rybinsk) is used as a drive.
The units showed excellent results during operation and fully comply with technical and operational requirements established for gas transmission equipment; they are quipped with an advanced remote control system with a high degree of protection.
Rated power, MW
|
10.2
|
Efficiency, %
|
35.5
|
Gas fuel flow at nominal rating, kg/h | 2 045 |
Power turbine shaft rated speed, rpm | 4 800 |
Overhaul life expectancy, h
|
25 000
|
Assigned life expectancy, h
|
100 000
|
Service life, years
|
20
|
Delivery period, months
|
9 - 12
|
Installation period, months
|
2 - 3
|
Gas compressor sets
Download the list of gas compressor sets (doc, 65 KB)
Please fill out the questionnaire in as much detail as possible.
The initial information received will be used to determine and calculate the equipment key parameters and estimate roughly its cost. Based on the data provided a technical proposal will be prepared taking into account your requirements and energy consumption conditions.
You can send us a filled out questionnaire by e-mail at This email address is being protected from spambots. You need JavaScript enabled to view it. and a copy at This email address is being protected from spambots. You need JavaScript enabled to view it.,
or by fax +7 (4855) 293-699.
Please note that a preliminary calculation based on the initial parameters provided in the questionnaire is made free of charge and filling out the questionnaire is non-binding for you.